When we purchased our cottage 12 years ago it came with three outbuildings.

The smallest was on the slope on the upper part of the lot which was so ramshackle that it was really only good for storing firewood.

20200322_131855

When we finally knocked this down as part of our Covid-19 Isolation campaign we found some hard evidence that this was once the original ‘privy’.

20200323_153749

At the driveway level there is a small but functional shed that we use mainly for garden tools, firewood, hoses, etc. It is in fairly good shape but is on the list for a make over this year – new roof, repair door, mouse proofing…

The priority for a makeover was the largest outbuilding, situated just outside our side door at the deck level. It measured only 6′ x 6′ with a low sloped roof and over the years it has been our tool and miscellaneous storage depot.

Time has not been kind to this shed and it became increasingly damp as the OSB walls and untreated foundations rotted.

20200317_111342_hdr

The old, dilapidated shed

The plan was to remove this shed and replace it with a larger and more functional one that would provide storage space for tools, but also function as a small workshop.

The first step involved the removal of the current shed which all went into a ten cubic yard disposal bin (along with the old privy, the rear deck and other bits of old lumber.)

20200318_144619

wp-15857130695795919625283691491480.jpg

The old shed 6′ x 6′ floor was to be extended to 8′ which, due to the proximity of the property line meant extending the footprint 2′ forward onto the deck area.

But first a trip to Gibsons Building Supplies (GBS) for some treated lumber and other wood.

wp-15857131051343238426949013848004.jpg

Then: Dig out the old foundation and reset the concrete pads.

wp-1588134317262726619387586790549.jpg

The treated 2x8s form the foundation frame which is then covered with 3/4 plywood.

wp-15881343193827090913763528224306.jpg

The two long stud walls are prefabbed on the deck.

wp-15881344434727204987812718749085.jpg

The walls are then man (and woman) handled over and fixed in place.

wp-15881344444321500725863884824373.jpg

Side story… I was dragging my feet on placing an order for a door but had resolved to do it on the very morning walk that I came across a used prehung exterior door as a freebie on the end of a driveway. It even swung the right way! Called Lisa. Bring the car!

Door installed and front/back wall started.

wp-15881350171583422915950431302949.jpg

The structure was then clad in 1/4 inch plywood.

wp-15881350173587569060994792074912.jpg

Trusses can be a little tricky so I went for this clever kit that was purchased at Lee Valley Tools. A quality product that takes the guesswork out of it. I wanted significant eaves on the sides and 12″ roof overhang front and back.

wp-15881350179096830494190681277420.jpg

10′ 1×4 stringers screwed to trusses.

wp-15885531601696005287648383566439.jpg

Roof clad with 3/8″ plywood

wp-15885531614461397649206983242383.jpg

Shingle processing station

wp-15885531608968436643022089447078.jpg

wp-15885531605372556902796566759597.jpg

Higher, steeper and scarier than the previous shed roof

Approximately 100 square feet of roof required three bundles of Malarkey shingles plus ten feet of flexi-shingles for the ridge.

We were fortunate to have such a great run of weather for this project.

Next up was to paint (matched the cottage) install gutters and the faux window – an old window frame with glass removed and a mirror glue on.

Inside view with rear window installed and plywood panelling. Metal bench, gym lockers, wire shelving and LED overhead light all brought over from our old family home. The vinyl plank flooring was left over from past bathroom renovation. Past time to get organized!

View from the doorway with peekaboo glimpse of Shoal Channel and Keats Island.


All that’s left to do is some door trim, and then we will extend the first 4 deck planks in front of the workshop so it “nestles” into the rest of the landscape like it has been there always. A final picure still to come, when these last tasks are completed. But first, we want to take a break for a few days!

Read Full Post »

It’s almost like we knew. We planned holiday travel for February instead of our usual May, and we blocked rentals on the cottage until late July so we could “enjoy it ourselves.”

And here we are, enjoying it as much as is possible in these unprecedented times. We can go out, work on the property until we are so tired we sleep deeply, and take a walk on the beach when we need to see a bigger piece of the sky. We are so lucky to have this option. Each day it sinks in a little deeper that this is likely to be our principle home this year. So, let the projects begin! Might as well make this time count.

We are rebuilding a shed, revamping the garden, tearing down an old deck, clearing massive amounts of overgrowth and then…well we’ll see. This may be the biggest transformation the place has seen in decades, so better document it here for our records.

A rotting and dangerous deck that predates us must go.
Ditto this shed, to be replaced with a larger and more weatherproof version.
This topsoil isn’t gonna spread itself.
But also making time (like that is hard) for health and wellness.

Hereafter: more pictures for the most part, to record our progress and our errily quiet lives at this most unusual time.

Sidebar, I’m going to learn how to drum via the internet, lose 4 pounds and reconnect with my core muscles.

These projects can’t mask the fact that the news is very distressing and I have to limit my consumption. So many people are in much more difficult circumstances than us, and the means to help are not clear as yet. Except of course, stay home.

Read Full Post »